Loyola University Chicago

Information Technology Services

LDAP Authentication with LUMC ( “Shared” Source of Truth) (PSS 709)

 

 

December 2009
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks/Vonder Heide / Health:

  • Completed prior reporting period.

August 2009
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks/Vonder Heide / Health:

  • Completed.

May 2009
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks / Health:

  • Completed transition to the Production Environment.
  • Next Steps: (1) With the transition to the Production Environment, address issues as they arise.

 

March 2009
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks / Health:
  • Completed transition to the Production Environment.
  • Next Steps: (1) Continue with ID cleanup effort; (2) Reach a consensus on how to rectify issue of password properly flowing throughout the environment.
 

 

November 2008
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks / Health: 

  • Built both the development and test environments to validate processes and design.
  • Successfully integrated rules for the Prospective Student Portal project into all environments.
  • Confirmed processes developed to support ID provisioning will function as expected by batch testing.
  • Worked with LUMC to remediate additional duplicate IDs uncovered during large scale testing.
  • Collaboratively with LUMC, revised the proposed structure for the production environment. Revision provides additional safeguards and protection from corruption issues and/or system failures for both locations.
  • Next Steps: (1) Complete the transition to the production environment and monitor the results to ensure that processes function as expected.

August 2008
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks / Health: 

  • LUMC LDAP was added to Benefits Express to allow users to use either LUC or LUMC to login to the system using their existing ID and password.   Completed in late May.
  • Completed clean-up of duplicate ids at LUC.   Coordination and verification of data clean-up with LUMC continues.
  • Meeting scheduled with LUMC to discuss subsequent project phases (Test and Production) and begin development of a detailed plan.   
  • Next steps: (1) Develop detailed plan to identify tasks for Testing and Production Roll-out; (2) Complete testing of LUC and LUMC processes in a Test Environment; (3)  Complete upgrade to the Production environment.

May 2008
Sponsor: LUC/LUMC (Kelly) / Project Manager: Pauliks / Health:  

  • Received verbal confirmation from LUMC on the approach to complete data clean-up prior to beginning pre-production testing. Met planned deliverable date for HR Benefits Express testing.
  • Continuing clean-up of ids at both LUC and LUMC.
  • LUC administrators confirmed that our data view is pointing to the production environment.